Updated اقرأ هذا الدليل بالعربية
In short: A UAE construction invoice is a tax invoice marked "Tax Invoice", with your TRN, the client's details, a number and date, the contract reference, and for progress claims: the contract value, work done to date, previous claims, any retention, the amount due before VAT, 5% VAT and the total in AED. Check the current FTA requirements with your accountant.
The three invoices on most jobs
- Deposit invoice, on signing. VAT is due when the deposit is received.
- Progress invoices, for each stage or month, showing work done to date.
- Final invoice, at handover, closing the account and stating any retention still held.
A progress invoice, line by line
| Line | Amount (AED) |
|---|---|
| Contract value incl. signed variations (before VAT) | 200,000 |
| Work done to date (60%) | 120,000 |
| Less: previous invoices | -60,000 |
| This invoice before VAT | 60,000 |
| VAT 5% | 3,000 |
| Amount due | AED 63,000 |
If the contract has retention, show it as its own line so both sides track it.
Details that get invoices paid
- A clear trigger: which stage or month this invoice is for, with photos if useful.
- A due date and how to pay (bank details or a payment link).
- The same numbering and item references as your quotation and variations.
- Sent the same day the stage is complete.
Federal Tax Authority (tax.gov.ae). General information, not tax advice.
