BOQ template for fit-out works

نموذج جدول كميات لأعمال التشطيبات

A bill of quantities (BOQ) is the priced list behind your quote: every item, its quantity, unit and rate. A clear BOQ wins trust with clients and consultants, and it is the base for variations and progress claims later.

Updated اقرأ هذا الدليل بالعربية

In short: A fit-out BOQ groups the work into sections (preliminaries, demolition, partitions and ceilings, flooring, finishes, joinery, MEP), and lists each item with a description, quantity, unit, rate and amount in AED. It ends with a subtotal, 5% VAT and the total.

The columns every BOQ needs

  • Item number, so the client and you can refer to a line (for example 3.2).
  • Description, specific enough to price: material, size, finish and what is included (supply, install, or both).
  • Quantity and unit: m² for areas, lm for lengths, nos for counted items, lot for a lump sum.
  • Rate and amount in AED. Amount = quantity × rate.

Standard sections for a fit-out

  1. Preliminaries: site setup, protection, permits by the contractor, cleaning, waste removal.
  2. Demolition and strip-out.
  3. Partitions and ceilings: gypsum or block walls, false ceilings, access panels.
  4. Flooring: screed, tiles, vinyl, skirting.
  5. Wall finishes: paint, wallpaper, cladding, tiling.
  6. Doors and joinery: doors, frames, ironmongery, cabinets, counters.
  7. MEP: electrical, lighting, plumbing, HVAC modifications, fire alarm and sprinkler changes.
  8. Provisional sums and exclusions.

A sample fit-out BOQ in AED

A small office fit-out of about 120 m², shortened to one line per section.

ItemQtyUnitRateAmount (AED)
1.1 Preliminaries and site protection1lot6,0006,000
2.1 Strip out existing finishes120m²354,200
3.1 Gypsum partitions, 12.5 mm both sides85m²12010,200
3.2 False ceiling, gypsum board120m²9511,400
4.1 Porcelain tiles 60×60 with skirting120m²15018,000
5.1 Emulsion paint, 3 coats340m²227,480
6.1 Doors with frames and ironmongery6nos2,40014,400
7.1 Lighting and power modifications1lot16,50016,500
Subtotal 88,180 · VAT 4,409AED 92,589
Example figures for layout only, not market prices.

Tips that save arguments later

  • Measure from drawings or site, and say which. If quantities are approximate, write "to be remeasured".
  • Use provisional sums for items you cannot price yet, and say how they will be adjusted.
  • Keep the item numbers fixed. Variations and progress claims refer back to them.
  • List exclusions under the BOQ, not in an email.

Standard measurement practice for UAE fit-out works. Figures are examples only.

Questions contractors ask

أسئلة يطرحها المقاولون

What is the difference between a BOQ and a quotation?

The BOQ is the itemised, priced list of work. The quotation is the offer around it: your terms, payment schedule, validity and the client's acceptance.

Which units are used in UAE BOQs?

Metric units: m² for areas, m³ for volumes, lm (linear metres) for lengths, nos for counted items and lot for lump sums.

Should the BOQ show VAT on every line?

Usually not. Lines are priced before VAT, and 5% VAT is added once to the subtotal.