Updated اقرأ هذا الدليل بالعربية
In short: A UAE contracting quotation should list your company and TRN, the client and site, an itemised scope with quantities and rates in AED, what is not included, the price before VAT, 5% VAT and the total, payment terms, how long the price is valid, the timeline, who handles approvals, and a place for the client to sign.
What a quotation is, and what it is not
A quotation is your offer: this work, at this price, on these terms. When the client accepts it in writing, it becomes the basis of your agreement, so everything you leave out is something you may end up doing for free.
A quotation is not a tax invoice. You show VAT on it so the client knows the full cost, but you issue the tax invoice later, when you bill.
What to include: a checklist
- Your details. Company name as on your trade licence, address, phone, email and your TRN if you are VAT registered.
- Client and site. The client's name, the site address (villa number, community, building and unit), and their TRN if they are a registered company.
- Reference and date. A quotation number you can find later, the issue date, and a revision number if you send a new version.
- Scope of work. What you will do, room by room or stage by stage. "Supply and install porcelain tiles" is not enough: give size, finish and the area.
- Itemised prices. Each line with quantity, unit (m², lm, nos, lot), rate and amount in AED. Clients trust a quote they can read line by line.
- Exclusions. What is not in the price: for example furniture, appliances, permit fees, or making good areas outside the scope.
- Assumptions and provisional sums. Anything you priced without seeing it, such as the condition behind existing tiles, written down with an allowance.
- Price, VAT and total. Subtotal, 5% VAT on its own line, and the total in AED.
- Payment terms. How much is paid before you start, at each stage, and at handover.
- Validity. How long the price holds. Material prices move, so 15 to 30 days is common.
- Timeline. Start date or notice needed, and the expected duration.
- Approvals. Who obtains and pays for permits and NOCs, from the authority, the master developer or the building management.
- Variations. That extra or changed work is priced and signed before it is done.
- Warranty. What you guarantee and for how long after handover.
- Acceptance. A place for the client's name, signature and date.
A sample quotation in AED
A small bathroom renovation, priced line by line. The figures show the layout; they are not market prices.
| Item | Qty | Unit | Rate (AED) | Amount (AED) |
|---|---|---|---|---|
| Strip out existing tiles, sanitary ware and debris removal | 1 | lot | 2,500 | 2,500 |
| Waterproofing to floor and shower walls | 12 | m² | 65 | 780 |
| Porcelain tiles 60×60, supply and install | 32 | m² | 145 | 4,640 |
| Sanitary ware and fittings, supply and install | 1 | set | 6,800 | 6,800 |
| Plumbing first fix and second fix | 1 | lot | 3,200 | 3,200 |
| Vanity unit with mirror, supply and install | 1 | nos | 2,900 | 2,900 |
| Subtotal | 20,820 | |||
| VAT 5% | 1,041 | |||
| Total | AED 21,861 | |||
How to show VAT
- Show it on its own line. Price before VAT, 5% VAT, then the total. A client comparing quotes needs to know whether a figure includes VAT.
- Put your TRN on it if you are VAT registered. Registration is required once your taxable supplies pass AED 375,000 in 12 months, and allowed from AED 187,500.
- Bill with a tax invoice. When you invoice, use a tax invoice that meets the Federal Tax Authority's current requirements. Your accountant can confirm the details for your business.
- E-invoicing is coming. The UAE is moving to mandatory e-invoicing in phases, starting with large businesses in January 2027. Businesses with revenue under AED 50 million are expected to follow from July 2027. Check the current dates with your accountant.
Payment terms UAE contractors use
Most jobs are paid in stages, so you are never carrying the whole cost yourself:
- An advance before you start. It covers materials and mobilisation, and it shows the client is committed.
- Progress payments. By stage (after first fix, after tiling) or by month on longer jobs.
- Final payment at handover. Sometimes with a small retention held until snags are closed.
Write each stage as a percentage and an AED amount, so there is nothing to work out later.
Give three options, not one price
A single price invites the client to bargain it down. Three options, each with a clear difference, let the client choose up instead.
Good
AED 21,861
Porcelain tiles, standard fittings
Better
AED 26,250
Large-format tiles, concealed cistern
Best
AED 32,550
Marble-look slabs, rain shower, niche lighting
Example totals including 5% VAT.
Mistakes that cost contractors money
- A vague scope. If the tile size or brand is not written down, the client can ask for a better one at the same price.
- No exclusions. Anything not excluded can be argued as included.
- No validity date. A client who accepts three months later expects three-month-old prices.
- Extras agreed by phone. Price and sign every variation before doing it.
- A quote sent as a WhatsApp message. Send a document the client can read, keep and sign.
VAT registration thresholds: UAE Federal Tax Authority. E-invoicing phases: KPMG, "UAE: Phased implementation of e-invoicing beginning January 1, 2027" (July 2026).
