Snagging and handover checklist for contractors

قائمة الملاحظات والتسليم للمقاولين

The last 5% of a job decides whether you get the final payment on time and whether the client recommends you. A clear snag list and a clean handover pack turn the end of a job into a reference.

Updated اقرأ هذا الدليل بالعربية

In short: Before handover, walk every room with your own snag list, fix what you find, then walk it again with the client. Record each snag with a photo, location and owner, close them, and hand over a pack with warranties, manuals, as-built details and the final invoice. Agree in the contract that the final payment follows the closed snag list.

Do your own snagging first

Walk the job a few days before the client does. Every snag you find first is one the client never sees.

  • Walls and ceilings: paint touch-ups, cracks, straight edges, clean lines at corners.
  • Floors: hollow or chipped tiles, grout lines, level, skirting fixed and sealed.
  • Doors and joinery: doors close without rubbing, handles and hinges tight, cabinets aligned.
  • Wet areas: no leaks, silicone neat, falls to the drain, water pressure and hot water.
  • Electrical: every socket and switch works, lights fitted, the distribution board is labelled.
  • AC: every unit cools, drains clear, grilles clean.
  • Cleaning: no dust, paint or adhesive on glass, fittings or floors.

Record snags so they get closed

  • One line per snag: room, what is wrong, a photo, who fixes it, and the date.
  • Share the same list with the client, so nobody adds items from memory later.
  • Close with a photo, and mark the date it was fixed.

What to hand over

  1. Warranties from you and from suppliers (waterproofing, AC units, appliances).
  2. Manuals and care instructions for equipment and finishes.
  3. As-built details: where pipes and cables run, changes from the drawings.
  4. Approvals and completion certificates where the job needed them.
  5. Keys, access cards and remotes.
  6. The final invoice and, if agreed, the retention release date.

Get the final payment released

  • Agree it in the contract: the final payment is due when the snag list is closed, not when the client feels finished.
  • Get the handover signed with the date, and send the final invoice the same day.
  • Minor snags after handover go on the defects list, not on hold against the whole payment.

General contracting practice.

Questions contractors ask

أسئلة يطرحها المقاولون

What is snagging?

Snagging is checking finished work for defects, such as paint marks, chipped tiles or doors that rub, and fixing them before handover.

Can the client hold the whole final payment for one small snag?

That depends on your contract. Avoid it by agreeing that the final payment follows the closed snag list, and that small items after handover go on a defects list.

How long is the defects period?

It is whatever your contract says. Write the period and what it covers in the quotation or contract.