Working with subcontractors: agreements and payments

العمل مع مقاولي الباطن: الاتفاقيات والدفعات

Most contractors use subcontractors for trades they do not cover in-house: MEP, gypsum, joinery, waterproofing. A clear subcontract protects both sides, and payment terms that follow your own keep your cash flow safe.

Updated اقرأ هذا الدليل بالعربية

In short: A subcontract should state the scope (ideally the same BOQ items as your contract), the price, the programme, payment terms linked to work done and to your own payments, any retention, how variations are agreed, insurance, and what happens if work is late or defective. Pay on time for work you have been paid for, and keep everything in writing.

What to put in a subcontract

  1. Scope: the exact items, with quantities and specifications, matching your BOQ.
  2. Price: lump sum or rates, before VAT.
  3. Programme: start, finish and key dates, linked to your programme.
  4. Payment terms: stages or monthly valuations, and when payment is due.
  5. Retention if you hold one, and when it is released.
  6. Variations: only by written instruction from you, priced before the work.
  7. Insurance and safety: their cover, and their responsibility for their workers.
  8. Defects and delays: how they are handled.

Keeping payments in step

Many contractors link subcontractor payments to their own, often called back-to-back payment. It protects your cash flow, but it can push the delay down the chain and damage relationships with good subcontractors.

  • Be clear in the contract about how and when you pay.
  • Pay promptly once you have been paid for their work.
  • Value their work fairly and on time, with the same measures you use with your client.

Protect yourself

  • Check their licence covers the trade, and their insurance is valid.
  • Do not pay ahead of work done, except an agreed advance for materials.
  • Pass your client's variations down in writing, at the same time.

General contracting practice. Take legal advice on subcontract terms.

Questions contractors ask

أسئلة يطرحها المقاولون

What is a back-to-back subcontract?

One where the subcontract terms, including payment, follow the main contract. Payment to the subcontractor is linked to payment from the client. Take legal advice on how such clauses apply.

Should I hold retention from subcontractors?

Many contractors do, especially when their client holds retention from them. State the percentage and release event in the subcontract.

Do subcontractors charge VAT?

If they are VAT registered, yes, at 5%. You can usually reclaim it if you are registered.